805
edits
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
* In Finland, four new [[wax foundation frames]] are usually included in every newly added box until July. After July, when the main nectar flow is over, the bees usually do not build new cells/combs. No [[queen excluder]] is used in Finland, because the worker bees don't like to go through it. The [[first expansion]] is usually done carefully by waiting for the colony to fully fill the existing space (“delayed expanding”). The rest of the expansions are done slightly earlier, so that the bees don't feel too cramped. | * In Finland, four new [[wax foundation frames]] are usually included in every newly added box until July. After July, when the main nectar flow is over, the bees usually do not build new cells/combs. No [[queen excluder]] is used in Finland, because the worker bees don't like to go through it. The [[first expansion]] is usually done carefully by waiting for the colony to fully fill the existing space (“delayed expanding”). The rest of the expansions are done slightly earlier, so that the bees don't feel too cramped. |