Equipment: Difference between revisions

Jump to navigation Jump to search
No change in size ,  11 July 2016
no edit summary
No edit summary
No edit summary
Line 11: Line 11:


'''Mid Summer'''<br />
'''Mid Summer'''<br />
The drone rearing usually stops in mid-July. The next Varroa control, then, is the so-called [[August treatment|Formic acid or thomyl]]. You should prepare materials and equipments for:
The drone rearing usually stops in mid-July. The next Varroa control, then, is the so-called [[Formic acid or thomyl|August treatment]]. You should prepare materials and equipments for:
* harvesting, extracting and storing the honey yield
* harvesting, extracting and storing the honey yield
* feeding the honey bee colonies
* feeding the honey bee colonies
* controlling the Varroa mites after harvesting.
* controlling the Varroa mites after harvesting.

Navigation menu