Equipment: Difference between revisions

Jump to navigation Jump to search
302 bytes added ,  27 May 2016
no edit summary
No edit summary
No edit summary
Line 7: Line 7:
Early Summer:
Early Summer:
For early summer, you should prepare  hive boxes with an appropriate number of wax foundation frames. Additionally, you will need some extra bottom boards, hive roofs, and hive bodies with wax foundation frames for managing swarming colonies.
For early summer, you should prepare  hive boxes with an appropriate number of wax foundation frames. Additionally, you will need some extra bottom boards, hive roofs, and hive bodies with wax foundation frames for managing swarming colonies.
Mid Summer:
The drone rearing usually stops in mid-July. The next varroa control, then, is the so-called August treatment. You should prepare materials and equipments for:
harvesting, extracting and storing the honey yield
feeding the honey bee colonies
controlling the varroa mites after harvesting.

Navigation menu